Company”s name: | ****CO., Limited Begin and end date: 2012-06-2013-11 | Enterprise nature: | State-owned enterprisesIndustry: Mechanics/Electrical Equipment/Heavy Industry | Job Title: | Electrical engineer | Job description: | 1)Travelling to factory with shipping equipment, installing and commissioning the equipment, give customer operate and maintenance training. 2)Supply spare parts after sales, ensure the customer equipment have minimum down time. 3)my main responsible on CT driver and servo motor , PLC and security current circuit, other related mechanical and pneumatic parts 。 4) Electrical circuit maintenance and sensor inspection. Including optical switch, magnet switch, touch proximity switch, infrared sensor, encoder, safety lock, sound and light horn, pressure gauge, measurement gauge, thermal couple, emergency circuit maintenance. 5)Resolve fault of Servo motor , fix all problem about inverter and other electrical equipment 6) Positioning device, put on power cable and communication wire, connecting wire, grounding and test, power on. 7)Adjust level of equipment, initial program and parameter, setting new parameter according to process. Keep our equipment continuous running when production coming. Equipment including stacker, transfer ,ITD and cross conveyor and pushbar, spray bridge. 8)Relay circuit fault check, and resolve it, including hydraulic switch ,flowmeter and plunger pump. 9)UPS power supply maintenance, ensure equipment running without shutting down. 10)work with equipment including : 1,SIEMENS step 7- 300 and 400 2,SIEMENS wccflex 2008 3,CT drive SP series and SK series 4,thermocouple 5,instrument for calculate pressure or flow 6,motor,servo motor. 7,relay,safety relay 11)my boss service manager is UK person | Reasons for leaving: | Company”s name: | ****CO., Limited Begin and end date: 2009-04-2012-06 | Enterprise nature: | Soly foreign funded enterprisesIndustry: Mechanics/Electrical Equipment/Heavy Industry | Job Title: | Electrical engineer | Job description: | 1)Respect of commissioning and installation of glass production line, coordinary with customer to solver various technology issue and working team arrange. 2)Communication with oversea expert to receive relate technical information and complete installation and debug. 3)Confirm schedule of the project installation following the planning on the contract. Arrange installation people to complete job step by step, resolve every urgently problem on site. 4)Debug every machine and set up the automatic line 5)training the staff of factory to operate and maintenance the gauge. 6)Solved the problem of electrical control circuit. 7)Communication with sales staff for production basical case, I can dispose related software and hardware. 8) inspect control system, and solve problem 9) supply technology direction 10)complete electrical debug 11)coordinate between corporation and client 12)maintains and replace the brake of motor. 13) Configure profibus network, communication between CUP and I/O module, and other ystem, including Ethernet and profibus-DP control network, MPI connecting. 14)Maintenance inverters(CT),maintenance motor with encoder, motor capacity from 4kw to 40 kw. 15)Electrical circuit maintenance and sensor inspection. Including optical switch, magnet switch, touch proximity switch, infrared sensor, encoder, safety lock, sound and light horn, pressure gauge, measurement gauge, thermal couple 16)Robot package maintenance, 6 axis servo motors, backoff programmer, resolve any fault an problem, make sure production no stop. Daily equipment maintenance. 17)my boss project manager is Italy person | Reasons for leaving: | Company”s name: | ****CO., Limited Begin and end date: 2005-07-2009-04 | Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment | Job Title: | electrical engineer | Job description: | july 2005 to April 2009—-furnace electrical engineer 1)Establish standard job sheet of instrument facility,establish item of maintenance,mission arrangement 2)Following specialist debug instrument equipment,then gave a training to other colleague. 3)In charge of purchase application,acceptance and managemen of equipment. 4)In charge of defect examining,improving step,improving tracking. 5)Resolving accident trouble of produce and recording the report. 6)Administrate document following the standard of ISO9000. 7)In charge of course of 5S activity. 8)Contact specialist,argue technology difficulty.. 9)In charge of maintence of software and hardware about Siemence PLC,improve control program. 10)Manage daily work in furnace,standard job sheet,polishing environment, purchase, project,solve emergency, maintence. 11)Being familiar with several sensor,proportion valve,electromagnetic valve. | Reasons for leaving: | make progress |
|